Engineered Flooring

Production process of three layer Engineered flooring:

First of all, the top layer, core, bottom layer should be natural drying and artificial drying (drying room), to ensure moisture content, so can produce.

1. Top Layer 4mm

2. Core, it is poplar 9mm

3. Bottom Layer

4. Put the top layer, core and bottom layer together to press

5. Profile, T&G, on the board of four sides

6. Cut, the big board cut into small piece for floor

7. Packing, checking quality, put the flooring in the carton box